Jump to content
HWBOT Community Forums

FUGGER

Members
  • Posts

    177
  • Joined

  • Last visited

  • Days Won

    5

Posts posted by FUGGER

  1. I estimate it to be around 500w@-110c capacity based various HEDT cpu's used.  On MSDT, you cannot dent the -110c.

    3x 110v 15a receptacles, I try not to have two from the same outlet, but its possible.

    I would prefer to deliver and train, emphasis on delivering a working cascade.

    This cascade is also setup for GPU use too.   

    • Like 2
  2. I am selling my 3-stage cascade to make way for my next build, costs are becoming a factor to my goal of -200c.

    Fully functional, no leaks or issues.

    R507/ISCEON89/R1150 -110C

    http://www.xtremesystems.org/cascade/c3.jpg

    3x Danfoss SC12 1/2HP Compressors

    http://www.xtremesystems.org/cascade/c4.jpg

    Sporlan TXV and PEV valves

    http://www.xtremesystems.org/cascade/c2.jpg

    Lytron heat exchanged

    Chilly1 evaporator block rev3

    http://www.xtremesystems.org/cascade/c1.jpg

    I will include socket mounting for every AMD/Intel MSDT socket to date along with spares.

    I will also include GPU mounting that can be re-purposed.

    I will not ship this cascade, pickup in Las Vegas or delivery to neighboring states.

    $8,491.44 pickup

    $8,622.90 delivered

    Negotiable 

    • Like 5
  3. Take it into +psi to something like +2bar, in a vacuum does get you a better temperature but at the cost of capacity.  With a cap tube you may never reach your capacity needs/potential of the gas.  What options of gas can you mix in?  R507 or Isceon89?

    Increase cap tube size, or switch to expansion valve.

    Also when you charge, listen to the compressor and do not over work it, you will hear when it starts to complain.

    I did not locate my box of blocks, but I found two used blocks if you want them.   I have modern mounting.  

    • Like 1
×
×
  • Create New...